Florida Property Tax Due Dates 2027

Florida property owners should understand the 2027 property tax payment deadlines to avoid losing early-payment discounts and facing delinquent tax consequences. Florida offers an installment payment program that allows eligible taxpayers to pay their estimated property taxes in four quarterly payments. The first two installments are due in June and September 2027, with specific discounts and late-payment rules.

Florida Property Tax Installment Due Dates 2027 – All 67 Counties

Florida property owners can use the quarterly installment payment program to pay their estimated property taxes in four payments throughout the year. The first installment is due in June, while the second installment is due in September. Florida follows a statewide schedule under Section 197.222, meaning these statutory deadlines generally apply across all 67 counties.

Showing all 67 Florida counties

Alachua County

FIRST INSTALLMENT June 30, 2027 Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENT September 30, 2027 Late Payment Consequence

The unpaid amount is added to the December installment. The overdue amount does not receive the 4.5% discount.

4.5% discount by September 30

Baker County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Bay County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Bradford County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Brevard County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Broward County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Calhoun County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Charlotte County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Citrus County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Clay County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Collier County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Columbia County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

DeSoto County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Dixie County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Duval County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Escambia County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Flagler County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Franklin County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Gadsden County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Gilchrist County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Glades County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Gulf County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Hamilton County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Hardee County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Hendry County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Hernando County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Highlands County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Hillsborough County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Holmes County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Indian River County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Jackson County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Jefferson County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Lafayette County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Lake County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Lee County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Leon County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Levy County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Liberty County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Madison County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Manatee County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Marion County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Martin County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Miami-Dade County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Monroe County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Nassau County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Okaloosa County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Okeechobee County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Orange County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Osceola County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Palm Beach County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Pasco County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Pinellas County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Polk County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Putnam County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

St. Johns County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

St. Lucie County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Santa Rosa County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Sarasota County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Seminole County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Sumter County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Suwannee County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Taylor County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Union County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Volusia County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Wakulla County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Walton County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30

Washington County

FIRST INSTALLMENTJune 30, 2027Late Payment Consequence

Late payment is accepted through July 31, but the 6% discount is lost. Failure to pay within the permitted period results in removal from the installment plan.

6% discount by June 30
SECOND INSTALLMENTSeptember 30, 2027Late Payment Consequence

The unpaid amount is added to the December installment without the 4.5% discount on the overdue amount.

4.5% discount by September 30
No matching county found. Please check the spelling and try again.

Important: Florida follows a statewide installment payment schedule under Section 197.222. The first installment is due June 30, 2027, and the second installment is due September 30, 2027. The 6% and 4.5% figures are timely-payment discounts, not fixed late-payment penalty rates. Confirm individual payment instructions with your county tax collector.

The dates and payment information are based on Florida’s installment payment framework. County tax collectors administer local payments. Check official 2027 notices for any updated administrative instructions.

Leave a Comment

Your email address will not be published. Required fields are marked *